RAW Digital Group is a construction marketing agency in Detroit, Michigan. It flies drone progress aerials with FAA Part 107 certified pilots, runs social media for general contractors, developers and AEC firms, and makes the project and recruiting video that goes with it. Drone rates are published; social media and video are quoted by scope.
Updated
The build is the story
General contractors, developers and AEC firms in Metro Detroit and across Michigan have the most visual work in the state and usually the least content. Every site changes every week, and the owners, developers and architects who decide who gets the next contract check LinkedIn and search before they call. We fly the work from the air, shoot it on the ground and keep your social accounts running with it, so the next bid and the next hire see what you build.
Plan the 2027 season before mobilization
Most of a season’s coverage is decided before the first crew is on site. January to April is when to set it up: which sites to document, when each one starts, which milestones to catch and who signs off on posts. With that agreed, the first flight sets the waypoints and angles we return to on every visit, and the social calendar is built around the milestones instead of whatever happened to get filmed.
What a season plan covers:
- A progress program for each site, flown from the same points so a year of visits lines up for owner reports, lender draws and a final timelapse. Program rates are on our construction drone photography page.
- Milestone dates such as groundbreaking, topping out, facade completion and ribbon cutting, with a crew booked for each.
- A monthly social calendar that turns every site visit into LinkedIn, Instagram and Facebook posts.
- Recruiting content shot on the same visits, ready for the spring hiring push.
Year-end and milestone content now
Winter is a good time to use what you already built. Projects that finished or topped out in 2026 can become year-in-review posts, award submissions, proposal reels and website case studies, built from your existing footage and from new completion aerials. Winter flights depend on wind, snow and daylight, so we schedule them with a backup date and shoot ground content and interiors in between.
Social media that shows the work
Social media is the top 2026 marketing priority for AEC firms, cited by 37.0% of them in Hinge Marketing’s 2026 High Growth Study, AEC edition. Most contractors still post only when there is a ribbon cutting. We run the accounts month to month: a calendar built from your sites, posting, replies, and reposting the owners, partners and trades who tag you, with an approval step your team controls. See social media management for how a plan is built.
Getting found in Google and AI answers
When an owner or developer searches for a contractor in a city, or asks ChatGPT or Google’s AI who to hire, the answers lean on Google Business Profiles, pages titled for the service and the place, and named, dated project pages. Your site footage is the raw material for those project pages. We write them, fix the listing details that AI tools read, and check what the engines say about you. No one can guarantee a place in an AI answer. See AI search optimization, or start with an AI visibility audit.
Construction work we have done
Barton Malow, 2025 (client). We edited “Barton Malow: Building Detroit’s Icons,” a vertical reel built from Barton Malow’s own footage of the Shinola Hotel, Little Caesars Arena and Hudson’s Detroit. It went through revised cuts with the company’s branding and communications team and was approved on October 23, 2025. See the Barton Malow project.
Ralph C. Wilson Jr. Centennial Park, October 2025 (client). The Detroit Riverfront Conservancy hired us to fly the 22-acre riverfront park while it was still an active construction site, ahead of its October 25, 2025 opening. We walked the site in hard hats and vests with Conservancy staff and the construction team, and handed two drone clips to the Conservancy for its own social and web use. The Conservancy brought us back in 2026 for Detroit Harvest Fest at the park. See the Centennial Park project.
JW Marriott Detroit Water Square, July 2025 to 2026 (our own project). We have flown the riverfront hotel on our own as it rose, with no client brief. The hotel asked to be added as a collaborator on the posts and requested the video for its own LinkedIn. See the Water Square project.
Greektown, January 10 and April 13, 2026 (our own flights). Two visits to the same downtown site, including a top-down view of the site. See the Greektown project.
Gordie Howe International Bridge, 2024 to 2026 (our own flights). Flights on May 23 and June 14, 2024, July 21, 2025, and June 8 and 9, 2026, from the deck and cable towers to wide passes before opening. See the bridge project.
One visit, every channel
A single site visit gives you aerials, ground video, crew interviews and stills. We cut them for LinkedIn, Instagram, owner reports, proposals and the website, so your marketing coordinator gets a folder they can use, not raw footage. Video is part of the same visit: walkthroughs, milestone films and recruiting reels on our construction video production page. Tell us about the season ahead. We reply within one business day.
